Approach and resources

A written method, from order to commence to acceptance

A public structure is built under the supervising engineer's eye and completed before an acceptance committee. Our method is to prepare every stage and keep a record of it.

Surveying total station on a road site
Illustrative image

The six stages

  1. 01

    Preparation

    File review, site visit, site set-up.

  2. 02

    Survey and quantities

    Setting out, profiles, setting-out report, agreed quantities.

  3. 03

    Studies

    Soil tests and foundation studies by an accredited laboratory; execution drawings.

  4. 04

    Plans

    Quality assurance plan (QAP) and environmental and social management plan (ESMP).

  5. 05

    Controlled execution

    Site meetings, inspections, measurement sheets.

  6. 06

    Acceptance

    Pre-acceptance, clearance of reservations, provisional acceptance, guarantee, final acceptance.

Read: from project brief to handover

The teams

Civil engineers, surveyors, a geotechnician, works managers, site supervisors, logistics and administrative staff. On each site, the organisation chart is formalised in the quality plan.

Resources deployed

Depending on the project, we deploy graders, compactors, loaders, tipper trucks, water tankers and pavers — notably hired from group companies — and accredited laboratories for testing. Elementary works may be entrusted to specialised teams under contract, supervised by our site supervisors.

Quality, safety, environment

Every site has a quality assurance plan and an environmental and social management plan submitted to the supervising engineer. They set out inspections, subcontractor management, the safety of teams and residents, and site reinstatement.