Provisional acceptance · 2022

Akonolinga – Minlo electrification, phase I

Three-phase medium-voltage network, six H61 substations and low-voltage networks on the Akonolinga – Minlo axis (Nyong-et-Mfoumou).

Provisional acceptance · 18 November 2022

Works

Three-phase rural electrification on concrete poles along the Akonolinga – Minlo axis, phase I.

Accepted scope

Three-phase MV network, one 100 kVA H61 substation, five 25 kVA H61 substations and LV networks.

Milestones

  1. Provisional acceptance — 18 November 2022

Project narrative

On the Akonolinga – Minlo axis, the first phase of electrification consisted of building a three-phase medium-voltage network on concrete poles, then equipping the communities with pole-mounted transformer substations: one 100 kVA H61 substation and five 25 kVA H61 substations feeding the low-voltage networks. Works were carried out under the control of a supervising engineer and the contract engineer appointed by the Ministry of Water and Energy. The acceptance committee pronounced provisional acceptance on 18 November 2022.

Power line on concrete poles with pole-mounted substation
Illustrative image
Illustrative image — does not depict this project.

KRG · The Engineer's Home

A structure to build?

Describe your project — type of works, location, stage of the file. A KHAYROUAL GROUP engineer will get back to you to discuss it.