Provisional acceptance · 2021· Commissioned 21/12/2021

Ayos – Kobdombo and Carrefour Ngalla – Ebolboum – Ngoulkeka electrification

Rehabilitation and extension of the Ayos – Kobdombo power network, officially commissioned in December 2021.

Provisional acceptance · 29 July 2021

Works

Rehabilitation of the Ayos – Kobdombo power network and electrification of the Carrefour Ngalla – Ebolboum – Ngoulkeka axis.

Accepted scope

On the first section, 240 poles of 11 m, rigid insulators, almelec conductor and household connections; on the second, a medium-voltage line and five single-phase transformers.

Milestones

  1. Provisional acceptance — 29 July 2021
  2. Official commissioning — 21 December 2021, with the network operator and the Ministry of Water and Energy

Project narrative

In spring 2021, the Ayos – Kobdombo network was in poor condition: broken or burnt wooden supports along the axis. The contract combined two jobs: rehabilitating this network and electrifying a new axis, from Carrefour Ngalla to Ngoulkeka. On 29 July 2021, the acceptance committee recorded 240 poles of 11 m in place, the insulators, the almelec conductor and household connections, as well as the medium-voltage line and five transformers on the second section. On 21 December 2021, official commissioning was recorded in the presence of the network operator and the Ministry of Water and Energy.

Power line on concrete poles with pole-mounted substation
Illustrative image
Illustrative image — does not depict this project.

KRG · The Engineer's Home