Soa – Essé MV/LV network extension
Extension of a three-phase overhead medium- and low-voltage network between Soa and Essé (Méfou-et-Afamba).
Works
Extension of the three-phase overhead MV/LV network serving the communities between the Mebougou junction and Etoutoua: supports, lines, pole-mounted substations, protection and earthing.
Milestones
- Works in progress
Ongoing works are shown without anticipated results; their acceptance will be published once pronounced.

Other projects
Akonolinga – Minlo electrification, phase I
Three-phase medium-voltage network, six H61 substations and low-voltage networks on the Akonolinga – Minlo axis (Nyong-et-Mfoumou).
Location
Nyong-et-Mfoumou · Centre
Ayos – Kobdombo and Carrefour Ngalla – Ebolboum – Ngoulkeka electrification
Rehabilitation and extension of the Ayos – Kobdombo power network, officially commissioned in December 2021.
Location
Nyong-et-Mfoumou · Centre
Minlop – Endom electrification, phase II
Three-phase electrification on concrete poles along the Minlop – Endom axis (Nyong-et-Mfoumou), phase II.
Location
Nyong-et-Mfoumou · Centre