Skip to content
All projects
Ongoing

Essabah – Lada II road

Triple surface-dressed road and drainage between Essabah and Lada II, with a spur to the Grâce Divine health centre (Mfou).

Works

Essabah river junction – Mbarga Mbazoa junction – Lada II section and spur to the Grâce Divine health centre: triple surface dressing and drainage structures provided for in the contract.

Milestones

  1. Works in progress

Ongoing works are shown without anticipated results; their acceptance will be published once pronounced.

Surfaced road crossing tropical hills
Illustrative image
Illustrative image — does not depict this project.

KRG · The Engineer's Home

A structure to build?

Describe your project — type of works, location, stage of the file. A KHAYROUAL GROUP engineer will get back to you to discuss it.