Skip to content
All projects
Ongoing

Maxwell district roads and service lanes

Triple surface-dressed roads and drainage in the Maxwell district (Méfou-et-Afamba).

Works

Roads and service lanes of the Maxwell district: triple surface dressing and drainage structures provided for in the contract.

Milestones

  1. Works in progress

Ongoing works are shown without anticipated results; their acceptance will be published once pronounced.

Surveying total station on a road site
Illustrative image
Illustrative image — does not depict this project.

KRG · The Engineer's Home

A structure to build?

Describe your project — type of works, location, stage of the file. A KHAYROUAL GROUP engineer will get back to you to discuss it.